Oil and Gas Processing Package
FAST Dehydration Package
2016-07-24
Applications
Remote well gas dehydration, gas temporary dehydration, fuel has dehydration, instrument air dehydration.
Advantages
Wet gas flows upward through one or a series of vessels that contain beds with FAST TABLETS of deliquescing desiccants. moisture is removed from the gas and accumulates on the surface of the tablets. Gas after dehydration flows out of the package.
FAST Tablets with longer life, low OPEX.
Simple and low CAPEX
No costly disposal, environmental friendly
Codes and Standards
GB150
ASME